Transnet Pipelines
Spanning the Nation, Constantly, Consistently.
Our network spans KwaZulu-Natal, Free State, Mpumalanga, Gauteng, and North West, featuring:
An inland accumulation facility at Jameson Park, Gauteng (TM2), with a capacity of 180Ml
A 29Ml tank farm in Tarlton for storage and distribution via rail and road
In 2024, we will commence the construction of a coastal terminal at Island View in Durban, enhancing our integrated rail and pipeline service. This development ensures the continuous supply of jet fuel to OR Tambo International Airport.
We are actively decommissioning the Durban to Johannesburg Pipeline (DJP) with a completion target of 2029. The DJP servitude from Durban to Kroonstad will be retained for potential future use based on ongoing studies.
Aligned with South Africa’s energy demands, we are expanding our natural gas supply chain logistics by developing LNG midstream infrastructure.
In collaboration with Vopak Proprietary Limited, we are set to construct and operate an LNG terminal at Richards Bay.
Over 80% of refined products for the inland market
More than 70% of jet fuel for OR Tambo International Airport
100% of crude for the National Petroleum Refiners of South Africa refinery
Over 500 million cubic meters of methane-rich gas annually to KwaZulu-Natal
100% of Tarlton Storage and Handling Terminal volumes, with 60% distributed over-border
202 Anton Lembede Street, Durban, 4001 / Email: [XXXXX][email protected]
TRANSNET PIPELINES: SOCIAL MEDIA PAGE
Copyright © Transnet 2024. All rights reserved.